Scheduler
The schedules in iSMA-B-AAC20 controllers are being created using schedule components, as found in the iSMA_controlApi kit (kit is installed as part of a default application). There are two types of scheduling components available–BooleanScheduleWeekly for Boolean values and NumericScheduleWeekly for numeric values. For both types there are available max. 8 events for 7 week days. In a scheduling component the start time and value is defined. If value is null (for Boolean) or nan (for numeric), the event is discarding. For non-defined event scheduler will take value from the Def Val slot.